Open the console

Onboarding Checklists for Contractor or Temporary Accounts

A contractor with a two-week engagement doesn't need your full onboarding checklist. Here's how to show them a reduced, time-aware set of steps instead.

Onboarding Checklists for Contractor or Temporary Accounts

Your onboarding checklist was built for an account that is going to stick around: invite the team, connect a data source, configure a workflow you expect them to still be running in six months. A contractor logging in for a two-week engagement, or a temp staffing an account over a single busy season, doesn't fit that shape. Walking them through the same list wastes their time and quietly inflates your completion metrics with steps nobody intended to keep using.

The mismatch is about time horizon, not permissions

It's tempting to solve this with the permission system you already have: hide steps a contractor role can't access, same as you would for any restricted role. That handles the case where a step requires an action the contractor isn't allowed to take. It doesn't handle the more common case, which is a step the contractor *could* do but has no reason to, because it only pays off over a time span longer than their engagement. Connecting a second data source, setting up a recurring export, inviting more teammates — all reasonable asks for someone staying a year, all noise for someone staying three weeks.

Permission-based hiding answers "can they do this." The checklist also needs an answer to "will this still matter to them before their access ends," and that second question needs an expiry date on the account, not just a role.

Give the account a known end date, then shrink the list around it

If contractor and temporary accounts already carry an end date — many do, because deprovisioning needs it anyway — the checklist can use that same field instead of inventing a second one. A step that only pays off after 30 days of use is not worth showing to an account that expires in 14.

// pseudocode: filtering steps by account lifespan
remainingDays := account.accessExpiresAt - now
visibleSteps := steps.filter(step =>
    step.payoffWindowDays == null || step.payoffWindowDays <= remainingDays
)

This needs one new attribute on each step definition — a rough payoff window, set once when you write the step, not per account — and reuses data you likely already store for deprovisioning. See the docs for how step visibility rules are evaluated per account; a lifespan filter slots in next to the existing permission filter rather than replacing it.

Don't build a second checklist flavor

The instinct here is often to maintain a separate "contractor track": a parallel set of steps, maintained independently, that someone has to remember to update every time the main checklist changes. That's a maintenance cost that outlives the contractors it was built for. A filter applied to one shared step list survives a product change automatically; a forked list needs someone to notice and copy the change over, and eventually nobody does.

The same applies to copy. Rather than writing contractor-specific wording for every step, add one line of context above the list — "Showing 4 of 11 setup steps, based on your access through March 3" — so the person understands why their list is shorter without every step itself needing a rewrite.

What happens when the engagement gets extended

Contracts get renewed more often than they get shortened, and a checklist that permanently hid a step because an account looked temporary on day one will be wrong the day that account's expiry moves out. Re-evaluate visibility against the current expiry date on every load rather than deciding once and caching the result — the filter in the snippet above already does this correctly if `accessExpiresAt` is read live, but it's worth checking directly: cache the filtered list and you'll have contractors stuck looking at four steps forever after a renewal that was supposed to unlock the rest.

What to measure instead of guessing

We don't have a measured figure for what share of temporary accounts complete the full checklist versus a time-filtered one — that depends entirely on your typical engagement length and step payoff windows, so don't borrow someone else's number here. What's worth instrumenting on your own data before deciding how much to build:

  • Completion rate on long-payoff steps, split by accounts with and without a known end date — this tells you whether temporary accounts are already self-selecting out of steps that don't apply to them, which would mean the filter saves confusion more than it changes outcomes.
  • Count of contractor/temporary accounts whose access was extended after creation — if renewals are rare, a one-time filter at account creation is enough and you don't need the live re-evaluation above.

Related reading

If the contractors in question are arriving as part of a larger company account, onboarding invited users covers how invited members differ from the account owner who sets the checklist up in the first place. For the related case of showing different steps by subscription level rather than time horizon, see onboarding checklists by plan tier. Try the live preview to see step filtering in action.

Try it on your app