Open the console

Rolling Out a New Onboarding Step to a Soft-Launch Cohort First

Shipping a new onboarding step to every account at once means any mistake hits everyone at once. Here is how to show it to a small cohort first and decide from there.

Rolling Out a New Onboarding Step to a Soft-Launch Cohort First

A new onboarding step looks finished once it renders correctly in staging and completes on your own test account. It is not finished in the sense that matters: nobody has seen it fail against a real account data, a real browser, a real network. Turning it on for every account the moment it merges means the first time you learn it is broken is from a support ticket, not a dashboard — and by then every account on the list has already seen it.

Why it worked on my machine is not the bar

The step that broke in production almost always worked in every environment where someone checked it by hand. The failure shows up at a scale and in a mix of accounts that a manual check never reproduces: an account with no team members yet, one on a plan that does not expose the feature the step points at, one whose locale breaks a string the step assumes is short. None of that is a reason to skip shipping the step. It is a reason to control how many accounts see it before you have confirmed it behaves.

A soft-launch cohort is the mechanism for that control: a defined slice of accounts sees the new step while everyone else still sees the checklist as it was yesterday. If something is wrong, it is wrong for the cohort, not for the account base.

Picking the cohort without writing new infrastructure

The simplest cohort is a property you already have on the account, not a new segmentation table. Account ID modulo a number, signup date after a cutoff, or an existing internal/beta flag all work as a gate — what matters is that it is deterministic, so the same account sees the same thing on every load instead of randomizing per request.

// pseudocode: deterministic cohort gate
function inSoftLaunch(accountID, percent) {
  return (hash(accountID) % 100) < percent
}

if (inSoftLaunch(account.id, 5)) {
  steps.push(newStep)
}

Start the percentage low enough that a bad outcome is cheap to notice and cheap to undo. See the docs for how step definitions are evaluated per account; a cohort gate sits in front of that evaluation rather than changing it.

Decide the exit criteria before you launch, not after

The easiest way for a soft launch to drift into a permanent half-rollout is to skip writing down, in advance, what result expands it and what result rolls it back. Without that, a flat completion rate in the cohort gets read as fine I guess for weeks because nobody set a bar it needed to clear.

Write both thresholds down before the cohort goes live: what completion rate (or error rate, or support-ticket rate) on the new step counts as good enough to widen the percentage, and what counts as bad enough to roll back to zero. Put a date on the decision too — a cohort with no expiry just becomes a second permanent code path nobody remembers to remove.

Rolling back has to be as cheap as rolling out

A gate that is easy to turn on and hard to turn off defeats the purpose. If disabling the new step for the cohort means a deploy, the speed advantage of testing small is already lost — the rollback should be the same config change as the rollout, ideally one you can make without touching code. That is also why the gate belongs in front of the step definition rather than branching logic scattered through the step own completion handler: one place to flip, one place to check.

What to measure instead of guessing

We do not have a measured figure for what cohort size or rollout duration is right for your checklist — that depends on your account volume and how much signal a small cohort gives you in a reasonable time. What is worth instrumenting before you decide:

  • Completion rate and error rate on the new step, split by cohort versus the rest of the account base, so you are comparing against a baseline rather than judging the number in isolation.
  • Time from cohort launch to a result you would act on — if a 5% cohort takes a month to produce enough completions to mean anything, either the cohort needs to be bigger or the step needs a faster-completing proxy metric.

Related reading

If the step you are rolling out is itself behind a feature flag rather than a cohort percentage, onboarding checklists behind a feature flag covers the flag-driven version of the same idea. For testing step order rather than a brand-new step, see A/B testing onboarding. Try the live preview to see the checklist a cohort gate would sit in front of.

Try it on your app